Making I.T. Work Since 1998

Airports and Terminals

Airports and Terminals

Imaginet International Inc was selected as the subcontractor for the ‘Network Rehabilitation’ at the 3rd terminal of Manila’s Ninoy Aquino International Airport (NAIA) by lead contractor, Japan’s Takenaka Group. The requested works were extended from the refurbishment of the fiber optic network and upgrading of the Core and Edge switches, to include implementation of a High Availability Firewall solution, a Network Management system, replacement of four 30K UPS’s and the installation and commissioning of the passenger flight information display screens (FIDS).

Now completed and reopened, the NAIA 3 terminal building is estimated to have the capacity to service up to 33,000 passengers daily at peak. With its 34 air bridges and 20 contact gates, it can serve up to 28 planes simultaneously.

Quote Me Have a Consultant call me
Bank and Finance Bank and Finance

The following case studies are representative of work performed for the Airports and Terminals in the Philippines.

network implementation
Network Implementation Case Study
Read More
Network design
Network Design Case Study
Read More
Network monitoring
Network Monitoring Services Case Study
Read More
Managed Network Services
Managed Network Services Case Study
Read More

Industry references are available on request.